BOARD APPROVES CONTRACTS FOR 27 BUILDING AND RENOVATION PROJECTS
COLUMBUS -- The Ohio State University Board of Trustees on
Friday (12/2) awarded contracts and established contingency funds
for 27 small construction and renovation projects.
The largest project involves a $643,000 addition to the
Child Care Center on Ackerman Road for a model integrated program
serving medically fragile and mentally retarded and
developmentally disabled children. The project is to be finished
this month. Construction costs are $535,420. The contractors
are C & N Construction Services, J. A. Croson, J. A. Guy Inc.,
and Now Electric, all of Columbus.
Other projects are as follows:
Columbus campus:
-- Public Safety Building: Install a roof-mounted air
conditioning system to serve the entire building, modify the
radiant heating system, and install a new system of direct
digital controls. The project was completed in September by
Columbus Heating and Ventilating, and Fetter Electric of Newark.
Total project cost was $285,000.
-- Bevis and Rightmire halls: Replace asphalt walkways on
the east side of Bevis Hall and the south side of Rightmire Hall.
Central Ohio Building Co. completed the project last June. Total
project cost was $115,121.
-- Road resurfacing: Surface West 10th Avenue from Clinic
Drive to Neil Avenue. The completion date is May 1996. The
contract was awarded to Kokosing Construction of Fredericktown.
Total project cost is $81,450.
-- Water-line extension: Complete the water line from
College Road to Neil Avenue to serve the main campus. The
completion date is January 1996. The contract was awarded to
Bale Contracting, Columbus. Total project cost is $500,000.
-- Street and Road Improvements: Resurface West 17th and
West 11th avenues, and Neil Avenue from 11th to South Oval Drive.
The completion date is June 1996. The contract was awarded to
Lionel Construction, Zanesville. Total project cost is $270,320.
-- Smith Lab: Replace nearly half of the roof and renovate
the parapet walls by February 1996. The contract was awarded to
Harold J. Becker Co. of Dayton. Total project cost is $145,755.
-- Animal Science Building: Renovate sections of the
basement and first floor to meet U. S. Department of Agriculture
requirements for operating the meat lab. The completion date is
December 1995. The contractors were Farber Corp., Dorsey
Construction Co., and Electric Power Equipment Co., all of
Columbus, and Hunter Environmental of Seven Hills. Total project
cost is $395,500.
-- Campus Lighting Renovation: Complete exterior lighting
improvements for safety and security along Oval and Mirror Lake
Hollow sidewalks by May 1996. The contract was awarded to Elite
Building/Electric Power Equipment (AJV), Westerville. Total
project cost is $500,000.
-- Research Center: Phinney Industrial Roofing Inc. Of
Dayton replaced the roof last August. Total project cost was
$477,250.
-- Smith Lab: Remodel space vacated by the Physics Library
for classroom use, a project finished last June. The contractors
were Williamson Builders, Plain City; R.J. Lemmons, Springfield;
and Knight Electric, Gahanna. Total project cost was $145,755.
-- Larkins Hall: Replace the roof by August 1996. The
contract was awarded to the Columbus Roofing and Sheet Metal.
Total project cost is $500,000.
-- Postle Hall: Renovate outdated research laboratories to
meet current and future standards and requirements, and convert
outdated clinical facilities into labs. The completion date is
April 1996. The contracts were awarded to C & N Construction, J.
A. Croson Co., Bloomer Mechanical, and R. R. Kinsey, all of
Columbus. Total project cost is $538,982.
-- Starling-Loving Hall: Replace the heating, air
conditioning and hot water system in wing A by September 1996.
The contracts were awarded to J. A. Guy of Dublin and El-O
Services Co. of Columbus and Pickerington. Total project cost is
$156,650.
-- Turfgrass Field Services Building: Provide site work and
utilities for the building, which was donated by the Ohio
Turfgrass Foundation. George Igel of Columbus completed the
project in September. Total project cost was $251,380.
-- Koffolt Lab: Renovate rooms 103 and 117 to create two
new laboratories. Work was finished in September by Good Home
Maintenance, J.A. Croson, C.R. Legner, and Romanoff Electric, all
of Columbus. Total project cost was $446,349.
-- Campus Grounds: Replace 33 emergency telephones and
install 92 additional telephones to enhance security around
campus. The completion date is February 1996. The contract was
awarded to Brush Contractors, Grove City. Total project cost is
$400,000.
-- South Polo Field Addition Parking Lot: Replace gravel
lot with a paved surface, better drainage, and new lighting. The
project was completed in October by Strawser Paving and Romanoff
Electric, both of Columbus. Total project cost was $250,000.
-- Byrd Polar Research Center Sediment Core Archival
Coldroom: Provide storage facilities and equipment for Russian
and American Arctic sediment cores. The completion date is
February 1996. The contracts were awarded to Paul Vlack of Canal
Winchester and J. A. Croson and Romanoff Electric. Total project
cost is $330,000.
-- Rhodes and Doan halls: Renovate the atrium between the
buildings by installing a new ceiling and lighting, painting the
north wall along Doan Hall, and cleaning the sculpture. The
completion date is July 1996. The contracts were awarded to
Field and Associates of Springfield and Romanoff Electric. Total
project cost is $504,500.
-- University Hospitals Clinic: Renovate a suite of general
offices on the first floor to provide outpatient examination
areas. The completion date is March 1996. The contracts were
awarded to Good Home Maintenance, Franklin Fire Protection, and
Charles Hardy Inc., all of Columbus, and R. J. Lemmons of
Springfield. Total project cost is $265,000.
The Ohio State University-Marion
-- Childcare Center: Renovate the parking facilities and
install playground facilities. Downing Construction of Baltimore
completed the project in November. Total cost was $167,340.
Ohio Agricultural Research And Development Center, Wooster
-- Pesticide Storage Building: Construct about 1,500 square
feet of enclosed space with proper floor, air handling, utilities
and exhaust hood for the storage and mixing of pesticides. The
project was completed in September by Alvada Construction Inc.,
Alvada; Warner Mechanical Corp., Fremont; and A. T. Emmett Inc.,
Port Clinton. Total project cost was $144,500.
-- Library Expansion and Video Center: Renovate a section
of Fisher Auditorium to provide additional space for the library
and develop a video center incorporating the video classroom.
The project is to be finished this month. The contractors are
Stanley Miller Construction Co. of East Sparta; Schmid Plumbing
and Heating Inc. of Wooster; and Abbott Electric Inc. of Canton.
Total project cost is $192,000.
Agricultural Technical Institute, Wooster
-- Mechanical and Masonry Improvements: Improve the
mechanical equipment and heating, ventilating and air
conditioning controls, improve masonry and make foundation and
structural modifications to buildings on the campus. The
project was completed in September by Stanley Miller Construction
Co. of East Sparta and Schmid Plumbing and Heating Inc. of
Wooster. Total project cost was $102,743.
OARDC Southern Branch, Ripley
-- Roads and Parking Lots: Repair and resurface by July
1996. The contract was awarded to L. P. Cavett of Cincinnati.
Total project cost is $70,000.
ATI and OARDC
-- Roofs: Replace roofs on Skou Hall on the ATI campus and
on the Agricultural Engineering Building, Gerlaugh Hall and 10
other buildings on the OARDC campus by August 1996. The contract
was awarded to Lepi Enterprises of Zanesville. Total project
cost is $373,500.
In another matter, the trustees approved changes in two
other projects slated for Doan Hall, authorizing the employment
of architectural and engineering firms to design an endoscopy
suite and peripheral lab as a combined project and expanding roof
replacement for Doan from the west half to the entire building.
The endoscopy suite-peripheral lab project is estimated to cost
$1.2 million, including $950,000 for construction. The roof
replacement project is estimated at $1,180,500, including
$936,500 for construction.
#
Contact: Robert Haverkamp, assistant to the vice president for
business and administration, (614) 292-7970, for information on
contracts and amounts, or the Office of the University Architect
and Physical Planning, (614) 292-4458.
[Submitted by: Von Reid-Vargas (ereid@magnus.acs.ohio-state.edu)
Fri, 1 Dec 1995 15:10:52 -0500]